Main one was the summerhouse rebuild that we inherited with this house.
Water running through the roof and windows and everywhere else, rotten floorboards, rotten roof etc etc.
Finished it all last night just in-time for the rain coming tomorrow.
What jobs have you been up to?
The waterfall

Rotting window frames causing wet and rotten floors



A redo of the wiring

And away with the rot


Wood filler in the floorboards


Drying everything out



Had to make new frames for the windows

Ah the smell of new wood, although it was a PITA to get hold of during lockdown


Gave all the the wood a couple of coats of preservative, then followed by a wood wax for the inside and protectant on the outside and a hard wood wax stain for the floor

and finally finished today





Built a new lean to while I was at it.

My arthritis is in full force now, shoulders, knees and hands, so just finished in time.

